Enter the wall area, render thickness and the consumption printed on the bag, and get the kilograms and the number of premix bags. For contractors, QS and home owners in Dubai, Sharjah, Abu Dhabi and Ajman working in m² and bagged render.
Worked example
With the calculator’s starting values:
| Wall area | 50 m² |
|---|---|
| Openings to deduct | 0 m² |
| Render thickness | 15 mm |
| Consumption per mm thickness | 1.6 kg/m² |
| Bag weight | 25 kg |
| Wastage | 10 % |
| Render bags | 53 bags of 25 kg |
|---|---|
| Render powder | 1,320 kg |
How it is calculated
Powder per m² = thickness (mm) × consumption per mm (kg/m²)
Powder = (wall area − openings) × powder per m² × (1 + wastage)
Bags = powder ÷ bag weight, rounded up
Premix renders are dry bagged mixes that only need water, so the quantity comes straight from the consumption the maker states for each mm of thickness.
Defaults you can change
The 1.6 kg/m² per mm consumption, 25 kg bag, 15 mm thickness and 10% wastage are example values. Consumption differs between products, so use the figure on the bag or data sheet. For site-mixed cement and sand plaster, use our plaster calculator instead.
Premix render in the UAE
Bagged premix renders and plasters are used for internal and external walls in Dubai, Sharjah, Abu Dhabi and Ajman, alongside site-mixed cement and sand plaster. In summer heat, external render can dry too fast, so follow the maker’s guidance on wetting the background and curing, and keep to the thickness on the specification or approved drawings.
Questions
How many m² does one bag of render cover?
It depends on the product and thickness. With 1.6 kg/m² per mm at 15 mm, a 25 kg bag covers about 1.04 m² before wastage.
Should I deduct openings?
Yes for large doors and windows. Many people leave small openings in to cover the reveals and edges.
Is VAT included in the bag count?
The calculator gives quantities only. Building materials in the UAE normally carry 5% VAT on the price.