For villa owners and contractors in the UAE: enter the added built-up area in sq ft and your construction rate in AED, add the consultant fee, any master developer and authority fees, and get the estimated extension cost with contingency and 5% VAT.
Worked example
With the calculator’s starting values:
| Added built-up area | 500 sq ft |
|---|---|
| Construction rate | 350 AED per sq ft |
| Consultant design and supervision fee | 5 % of construction |
| Developer modification fee | 0 AED per sq ft |
| Developer review or NOC fee | 0 AED |
| Authority permit and other fees | 0 AED |
| Contingency | 10 % of construction |
| VAT on construction and consultant | Add 5% VAT |
| Estimated extension cost | 211,313 AED |
|---|---|
| Construction | 175,000 AED |
| Consultant fee | 8,750 AED |
| Contingency | 17,500 AED |
| VAT at 5% | 10,063 AED |
| Developer fees | 0 AED |
| Authority and other fees | 0 AED |
How it is calculated
Construction = added area × rate per sq ft
Consultant = construction × consultant %; contingency = construction × contingency %
VAT = (construction + consultant + contingency) × VAT
Developer fees = added area × fee per sq ft + review fee
Total = construction + consultant + contingency + VAT + developer fees + authority fees
About the starting values
The AED 350 per sq ft rate is a placeholder, not a market rate, and the 5% consultant fee and 10% contingency are examples; use your own quotes. Developer and authority fees start at zero because each master developer and authority sets its own, and we could not confirm current figures. Ask your developer and consultant for them and enter them here. Developer and authority fees are entered as invoiced, without adding VAT.
Villa extensions in the UAE
An extension needs a building permit, and in master-planned communities in Dubai you usually also need the master developer’s approval, which can come with its own fees. In Sharjah, Abu Dhabi and Ajman the permit comes from the local municipality or planning authority. A consultant normally prepares the drawings and handles the approvals, so add their fee from the start.
Questions
Do I need the developer’s approval for an extension?
In many master-planned communities, yes, before the authority permit. Check your community’s modification rules.
Why are the developer fees zero?
They differ by developer and change over time, so enter the figures your developer quotes.