For site-mixed concrete: enter the volume and the nominal mix ratio and get the number of 50 kg cement bags, the sand and aggregate volumes, and the water for your chosen water-cement ratio.
Worked example
With the calculator’s starting values:
| Concrete volume (wet) | 1 m³ |
|---|---|
| Mix ratio (cement : sand : aggregate) | 1 : 2 : 4 (nominal M15) |
| Dry volume factor | 1.54 |
| Cement bag size | 50 kg |
| Cement bulk density | 1,440 kg/m³ |
| Water-cement ratio | 0.5 |
| Wastage allowance | 2 % |
| Cement | 7 bags of 50 kg |
|---|---|
| Sand | 0.45 m³ (15.8 cft) |
| Aggregate | 0.90 m³ (31.7 cft) |
| Water | 162 litres |
How it is calculated
Dry volume = wet volume × dry volume factor × (1 + wastage)
Each material = dry volume × its share of the ratio (for 1:2:4, cement is 1 ÷ 7)
Cement bags = cement volume × cement bulk density ÷ bag weight
Water = cement weight × water-cement ratio
The dry volume factor allows for the voids between loose particles that disappear once the concrete is mixed and compacted. 1.54 is the factor commonly used in nominal-mix estimating.
Defaults you can change
- Cement bulk density 1,440 kg/m³ and 50 kg bags, the usual estimating values for ordinary Portland cement.
- Water-cement ratio 0.5. Lower ratios give stronger concrete but need more workability help; follow your specification.
- Grade names such as M20 follow the Indian nominal-mix convention that many UAE site teams use. They are approximate.
When not to use nominal mixes
Structural concrete in the UAE is normally specified as a designed mix and supplied by a ready-mix plant with test certificates. Use this calculator for small site-mixed work such as blinding, kerb bedding, small plinths and repairs, and follow your engineer’s specification for anything structural.
Site-mixed concrete in the UAE
For small jobs in Dubai, Sharjah, Abu Dhabi and Ajman, such as blinding, kerb bedding and repairs, cement comes in 50 kg bags and sand and aggregate are often quoted by the cubic foot, so the calculator gives both m³ and cft. In hot weather the mix loses water quickly, so keep materials shaded, stick to the water-cement ratio in your specification and cure the concrete properly.
Questions
How many cement bags are in 1 m³ of 1:2:4 concrete?
With the defaults above (factor 1.54, 1,440 kg/m³, no wastage), about 6.3 bags of 50 kg. Change the inputs to match your own assumptions.
Can I get sand in tonnes?
Sand density varies with moisture and grading, so the calculator shows volume. Ask your supplier for the density of the sand they deliver.