Gypsum Partition Calculator UAE: Boards, Studs and Tracks

Enter the partition length and height, the board layers and stud spacing, and get the gypsum boards, studs and tracks for a metal-stud drywall partition.

Gypsum boards13 boards

Worked example

With the calculator’s starting values:

Inputs
Partition length6 m
Partition height3 m
Openings to deduct2 m²
Board layersOne layer each side
Board size1200 × 2400 mm
Stud spacing600 mm
Track and stud stock length3 m
Board wastage10 %
Results
Gypsum boards13 boards
Studs11 pieces at 3 m
Track (floor and ceiling)12 m
Track pieces4 pieces of 3 m

How it is calculated

Boards = (length × height − openings) × layers ÷ board area × (1 + wastage)

Studs = partition length ÷ spacing + 1

Track = 2 × partition length (floor and ceiling)

Openings need extra studs and track at their sides and heads, and partitions often need studs at junctions and corners, so add those from your drawings. Stud height above about 3 m may need a deeper stud or closer spacing: follow the board manufacturer’s system tables for the height and the fire or acoustic rating you need.

Drywall partitions in the UAE

Gypsum board partitions on metal studs are widely used for fit-out work in offices, shops and flats in Dubai, Sharjah, Abu Dhabi and Ajman. Fire-rated and moisture-resistant boards are specified for many areas, and fit-out work often needs approved drawings before it starts, so check the board type and system against yours.

Questions

Which board should I use in bathrooms?

Moisture-resistant board for humid rooms and cement board behind tiles in showers. Our guide on gypsum board vs cement board explains the difference.

Does this include screws and joint compound?

Not yet. Consumption of screws, tape and compound depends on the system; check the board manufacturer’s figures.

Shopping Cart
Scroll to Top