For home owners, landlords and fit-out contractors in the UAE: enter the cabinet run in metres, the worktop size, tiling in m² and the plumbing and electrical points, add your own AED rates, and get a kitchen renovation budget with contingency and 5% VAT.
Worked example
With the calculator’s starting values:
| Cabinet run (base and wall) | 6 m |
|---|---|
| Cabinet rate | 1,500 AED per m |
| Worktop length | 4 m |
| Worktop depth | 0.6 m |
| Worktop rate | 800 AED per m² |
| Floor and wall tiling | 14 m² |
| Tiling rate, supply and fix | 120 AED per m² |
| Painting and ceiling | 1,500 AED |
| Plumbing and electrical points | 8 points |
| Rate per point | 250 AED |
| Appliances | 0 AED |
| Removal of the old kitchen | 1,000 AED |
| Contingency | 10 % |
| VAT | Add 5% VAT |
| Estimated kitchen renovation cost | 19,751 AED |
|---|---|
| Cabinets | 9,000 AED |
| Worktop | 1,920 AED |
| Tiling | 1,680 AED |
| Painting and ceiling | 1,500 AED |
| Plumbing and electrical | 2,000 AED |
| Removal of the old kitchen | 1,000 AED |
| Contingency | 1,710 AED |
| Total before VAT | 18,810 AED |
| VAT at 5% | 941 AED |
How it is calculated
Cabinets = cabinet run (m) × rate per m
Worktop = length × depth × rate per m²
Tiling = tiled area × rate per m²; MEP = points × rate per point
Subtotal = cabinets + worktop + tiling + painting + MEP + appliances + removal
Total = subtotal × (1 + contingency) × (1 + VAT)
About the starting values
All rates and lump sums are placeholders, not market prices. Replace them with the quotes you get from your joiner, stone supplier and contractor. The 10% contingency is an example; older kitchens often hide plumbing or wiring that needs replacing.
Kitchen renovation in the UAE
In apartment buildings in Dubai, Sharjah, Abu Dhabi and Ajman, the building management or landlord usually has to approve renovation work before it starts, and tenants need the landlord’s consent. Moving sinks or gas points changes the plumbing and may need further approval, so keep the existing layout if the budget is tight.
Questions
How do I measure the cabinet run?
Measure the length of the base cabinets along the wall and add the length of the wall cabinets, in metres. If your joiner prices base and wall units separately, enter an average rate.
Is VAT included?
Choose “Add 5% VAT” if your quotes are before VAT. Choose “No VAT” if they already include it.
