For drywall contractors, QS and home owners in Dubai, Sharjah, Abu Dhabi and Ajman: enter the gypsum board area in m² and the consumption from the data sheet to get packs of joint compound, rolls of joint tape and corner bead pieces.
Worked example
With the calculator’s starting values:
| Board area to finish | 100 m² |
|---|---|
| Compound use | 0.4 kg/m² |
| Bag or bucket size | 25 kg |
| Joint tape per m² of board | 1.25 m |
| Tape roll length | 75 m |
| External corners to bead | 6 m |
| Corner bead length | 3 m |
| Wastage | 10 % |
| Joint compound | 2 packs of 25 kg |
|---|---|
| Joint tape | 2 rolls of 75 m |
| Corner bead | 3 pieces of 3 m |
How it is calculated
Compound = board area × use per m² × (1 + wastage)
Packs = compound ÷ pack size, rounded up
Tape = board area × tape per m² × (1 + wastage), in rolls rounded up
Corner bead = corner length × (1 + wastage) ÷ bead length, rounded up
Tape per m² of board
A 1200 × 2400 mm board has 2.88 m² of face. With joints on every edge, each board adds 2.4 m of long-edge joint and 1.2 m of end joint, which gives (2.4 + 1.2) ÷ 2.88 = 1.25 m of joint per m². Boards fixed full height with no end joints need less, about 0.83 m per m².
Defaults you can change
The 0.4 kg/m² compound use is only an example. Consumption depends on the product, the number of coats and how wide the joints are feathered, so use the figure on the product data sheet. Pack size, roll length and bead length should match what you buy.
Jointing gypsum board in the UAE
Gypsum board walls and ceilings are widely used in villas, apartments and offices in Dubai, Sharjah, Abu Dhabi and Ajman. Joint compound comes as powder in bags or ready-mixed in buckets, and tape and corner bead are sold by the roll and by the piece. Heat speeds up drying in summer, so keep buckets closed and out of the sun, and follow the specification for the number of coats.
Questions
Powder or ready-mixed compound?
Both work. Powder is mixed with water on site and ready-mixed compound is used straight from the bucket. Enter the consumption and pack size of the one you use.
Do I count both faces of a partition?
Yes, if both faces are jointed. Enter the board area of every face that will be finished.
Do the quantities include VAT?
No. The calculator gives quantities only. Building materials in the UAE carry 5% VAT, so check whether a supplier’s quote is before or after VAT.