Labour Cost Calculator UAE: Crew Cost, Overtime and Cost per Unit

For contractors, site managers and QS in Dubai, Sharjah, Abu Dhabi and Ajman. Enter the crew size, working days, day or hourly rate in AED and any overtime, and get the labour cost, man-days, man-hours and the cost per m², m³, m or number of work done.

Labour cost3,468.75 AED

Worked example

With the calculator’s starting values:

Inputs
Number of workers4
Working days5 days
Normal hours per day8 h
Rate basisPer day
Normal rate per worker150 AED
Overtime hours per worker per day1 h
Overtime rate multiplier1.25
On-costs0 %
Quantity of work done100
Unitm²
Results
Labour cost3,468.75 AED
Labour cost per m²34.69 AED/m²
Man-days20 man-days
Man-hours including overtime180 man-hours

How it is calculated

Man-days = workers × working days

Hourly rate = day rate ÷ normal hours (or the hourly rate you enter)

Normal time cost = man-days × day rate

Overtime cost = man-days × overtime hours × hourly rate × multiplier

Labour cost = (normal time + overtime) × (1 + on-costs)

Cost per unit = labour cost ÷ quantity of work done

With the starting values, the hourly rate is 150 ÷ 8 = 18.75 AED, normal time is 20 man-days × 150 = 3,000 AED and overtime is 20 × 1 × 18.75 × 1.25 = 468.75 AED.

Defaults you can change

The 150 AED day rate, the crew size, the hours and the 1.25 overtime multiplier are example values. Use your own rates, your labour supply contract and current labour law.

Labour costs in the UAE

Site labour in Dubai, Sharjah, Abu Dhabi and Ajman is priced per man-day or per hour in AED, either as direct staff or through labour supply companies. Outdoor work stops for the summer midday break, so plan the daily hours and outputs with that in mind, and check whether accommodation and transport are already in the rate before you add on-costs.

Questions

What overtime rate should I use in the UAE?

UAE labour law sets overtime pay at the normal wage plus at least 25%, and at least 50% for overtime between 10 pm and 4 am, except for shift workers. Check the current law and your employment or supply contracts.

Should the day rate include accommodation and transport?

It depends on how you pay the crew. If the rate does not include them, add them as on-costs.

How do I get a cost per m²?

Enter the quantity of work the crew completes in the same period. The calculator divides the labour cost by that quantity.