Ice for Concrete Calculator UAE (Hot Weather Concreting)

For UAE batching plants, site engineers and QS planning summer pours: enter the mix weights per m³ and the temperature of each material in °C, choose a target concrete temperature, and get the kg of ice per m³ and for the whole pour.

Ice per m³25.1 kg

Worked example

With the calculator’s starting values:

Inputs
Target concrete temperature30 °C
Concrete to pour30 m³
Cement and binders380 kg
Aggregates (saturated surface dry)1,850 kg
Batch water including ice150 kg
Free moisture on aggregates20 kg
Cement temperature45 °C
Aggregate temperature35 °C
Batch water temperature25 °C
Latent heat of ice80 kcal/kg
Specific heat of cement and aggregate0.22 kcal/kg°C
Results
Ice per m³25.1 kg
CheckIce needed
Ice for the pour754 kg
Batch water for the pour3,746 kg

How it is calculated

T = [0.22 (Ta Wa + Tc Wc) + Tw Ww + Ta Wwa − 80 Wi] ÷ [0.22 (Wa + Wc) + Ww + Wi + Wwa]

Ice replaces part of the batch water: Ww = batch water − Wi

Solving for ice: Wi = [0.22 (Ta Wa + Tc Wc) + Ta Wwa + Tw × batch water − T × D] ÷ (Tw + 80)

D = 0.22 (Wa + Wc) + batch water + Wwa; ice taken at 0 °C

This is the heat balance used in hot weather concreting guidance such as ACI 305. It assumes all the ice melts during mixing, the ice is at 0 °C and the specific heat of cement and aggregate is 0.22. It does not include heat from the mixer, the sun or cement hydration, so measure the actual concrete temperature at the truck.

Defaults you can change

The mix weights and material temperatures are example values. Use your approved mix design and the temperatures measured at the plant. The ice cannot be more than the batch water, so if the check row says ice alone cannot reach the target, cool the aggregates or the water as well.

Cooling concrete in the UAE

Summer air temperatures in Dubai, Sharjah, Abu Dhabi and Ajman make hot weather concreting the normal case for much of the year, and ready-mix plants commonly use chilled water and flake ice to keep fresh concrete within the limit in the project specification. Take the maximum placing temperature from the specification or the consultant, and plan pours for the cooler hours where you can.

Questions

Why does ice cool concrete more than chilled water?

Melting ice absorbs about 80 kcal per kg before it even starts to warm, so each kg of ice removes far more heat than the same kg of cold water.

Can I replace all the water with ice?

The formula allows up to the full batch water, but in practice plants keep some liquid water for mixing. Ask your ready-mix supplier what share of ice their plant can handle.

What target temperature should I use?

Use the maximum fresh concrete temperature in your project specification, less a margin for heat picked up during transport and placing.