For UAE batching plants, site engineers and QS planning summer pours: enter the mix weights per m³ and the temperature of each material in °C, choose a target concrete temperature, and get the kg of ice per m³ and for the whole pour.
Worked example
With the calculator’s starting values:
| Target concrete temperature | 30 °C |
|---|---|
| Concrete to pour | 30 m³ |
| Cement and binders | 380 kg |
| Aggregates (saturated surface dry) | 1,850 kg |
| Batch water including ice | 150 kg |
| Free moisture on aggregates | 20 kg |
| Cement temperature | 45 °C |
| Aggregate temperature | 35 °C |
| Batch water temperature | 25 °C |
| Latent heat of ice | 80 kcal/kg |
| Specific heat of cement and aggregate | 0.22 kcal/kg°C |
| Ice per m³ | 25.1 kg |
|---|---|
| Check | Ice needed |
| Ice for the pour | 754 kg |
| Batch water for the pour | 3,746 kg |
How it is calculated
T = [0.22 (Ta Wa + Tc Wc) + Tw Ww + Ta Wwa − 80 Wi] ÷ [0.22 (Wa + Wc) + Ww + Wi + Wwa]
Ice replaces part of the batch water: Ww = batch water − Wi
Solving for ice: Wi = [0.22 (Ta Wa + Tc Wc) + Ta Wwa + Tw × batch water − T × D] ÷ (Tw + 80)
D = 0.22 (Wa + Wc) + batch water + Wwa; ice taken at 0 °C
This is the heat balance used in hot weather concreting guidance such as ACI 305. It assumes all the ice melts during mixing, the ice is at 0 °C and the specific heat of cement and aggregate is 0.22. It does not include heat from the mixer, the sun or cement hydration, so measure the actual concrete temperature at the truck.
Defaults you can change
The mix weights and material temperatures are example values. Use your approved mix design and the temperatures measured at the plant. The ice cannot be more than the batch water, so if the check row says ice alone cannot reach the target, cool the aggregates or the water as well.
Cooling concrete in the UAE
Summer air temperatures in Dubai, Sharjah, Abu Dhabi and Ajman make hot weather concreting the normal case for much of the year, and ready-mix plants commonly use chilled water and flake ice to keep fresh concrete within the limit in the project specification. Take the maximum placing temperature from the specification or the consultant, and plan pours for the cooler hours where you can.
Questions
Why does ice cool concrete more than chilled water?
Melting ice absorbs about 80 kcal per kg before it even starts to warm, so each kg of ice removes far more heat than the same kg of cold water.
Can I replace all the water with ice?
The formula allows up to the full batch water, but in practice plants keep some liquid water for mixing. Ask your ready-mix supplier what share of ice their plant can handle.
What target temperature should I use?
Use the maximum fresh concrete temperature in your project specification, less a margin for heat picked up during transport and placing.