Gypsum Board Partitions in the UAE: How a Metal Stud Wall Is Built, Specified and Quantified

Interior under fit-out with new drywall partitions and a dust-covered floor

Short answer: a gypsum board partition is a light steel frame (floor and ceiling tracks with vertical studs, usually at 600 mm centres) lined on each side with one or two layers of gypsum board, screwed at set spacings, with mineral wool in the cavity when sound or fire performance is needed, sealant around the edges and taped, filled joints. The performance (fire minutes, sound reduction, maximum height) depends on the exact combination, so every serious partition is built to a manufacturer’s tested specification. For example, a Gyproc specification with 48 mm studs, two layers of 12.5 mm board each side and 25 mm acoustic roll gives 60 minutes’ fire resistance, Rw 49 dB and a maximum height of 3.4 m, at about 100 mm thick. Here is how a typical gypsum board partition UAE fit-outs use is built.

Interior under fit-out with new drywall partitions and a dust-covered floor
Photo by Steffen Lemmerzahl on Unsplash (illustrative image)

Key points

  • Partitions are fast, light and easy to route services through, which is why they dominate UAE fit-outs and villa extensions.
  • The stud size sets the height; the board layers and insulation set the fire and sound performance.
  • Knauf’s UAE KW 112 partition (two layers each side) reaches up to 120 minutes, up to 57 dB and up to 8.0 m high, depending on build-up.
  • Screws, joint staggering, sealant and the head detail matter as much as the boards.
  • Order from one system to keep the published performance valid.

The parts of a stud partition

ComponentWhat it does
Floor and ceiling track (channel)U-shaped profiles fixed to slab and soffit that hold the studs
StudsC-shaped vertical profiles; their depth and spacing decide how tall the wall can be
BoardsStandard, fire, moisture-resistant or acoustic gypsum boards; one or more layers per side
ScrewsDrywall screws long enough to penetrate the steel by at least 10 mm through all layers
InsulationMineral wool in the cavity for sound and, in many systems, fire performance
SealantAcoustic or fire sealant at the perimeter; small gaps leak sound and fire
Joint treatmentPaper tape and jointing compound, then skim or primer before decoration
Deflection headAllows the slab above to move without crushing the partition, where the structure needs it
ReinforcementExtra studs or plates at doors, and noggings for wall-hung cabinets, basins and TVs
General description; each manufacturer names its profiles differently.

A real specification, line by line

Here is a published Gyproc GypWall specification (reference A206035), useful because it shows how much detail a tested partition carries:

StudsGypframe 48S50 ‘C’ studs at 600 mm centres
TrackGypframe 50C50 floor and ceiling channel
Boards12.5 mm Gyproc WallBoard, 2 layers each side
Screws25 mm drywall screws for layer 1; 35 mm for layer 2; at 300 mm centres, 200 mm at external corners; min. 10 mm penetration into the steel
JointsStaggered between layers; paper tape on face joints; horizontal face joints backed by a fixing strap
Insulation25 mm Isover Acoustic Roll in the cavity
SealantGyproc Sealant around the perimeter on both sides
Finish2 mm skim coat, or one coat of drywall primer before direct decoration
Fire resistance60 minutes (BS 476)
Sound insulationRw 49 dB (laboratory, BS EN 717)
Duty ratingSevere (BS 5234)
Maximum height3,400 mm (L/240 deflection at 200 Pa)
Thickness100 mm nominal, excluding finishes
Source: Gyproc system specification A206035 (Gyproc Ireland). Middle East product names and tested figures can differ; ask for the regional specification for your project.

Notice how a “60-minute wall” is really a long list: change the stud, drop the acoustic roll, use shorter screws or skip the sealant and the published result no longer applies.

What changes for higher performance

  • Taller walls: deeper studs (for example 70, 92 or 146 mm series) or closer centres. The 48 mm stud in the example above stops at 3.4 m.
  • More fire resistance: fire-rated boards, more layers and often thicker boards. Knauf’s UAE KW 112 double-layer partition goes up to 120 minutes. Our fire-rated gypsum board guide explains why the system, not the board, carries the rating.
  • More sound reduction: thicker insulation, acoustic boards, resilient bars or twin-stud frames. Cinema-type walls in Gyproc’s Middle East literature reach Rw in the 70s with multiple layers and wide cavities.
  • Wet rooms: moisture-resistant boards, or cement board in showers; see gypsum vs cement board.

Worked take-off: a 5 m × 3 m partition

Using the build-up above (studs at 600 mm, two layers of 12.5 mm board each side), for a wall 5 m long and 3 m high with no doors:

ItemCalculationQuantity
Tracks5 m top + 5 m bottom10 m (plus laps)
Studs5 ÷ 0.6 = 8.3 spaces → 9 studs + 1 end stud = 10 studs × 3 m30 m
Board area15 m² × 4 layers60 m²
Boards (2400 × 1200 = 2.88 m²)60 ÷ 2.88 = 20.8 → 21, +10% cuttingabout 23 sheets
Acoustic rollWall area15 m²
SealantPerimeter 2 × (5 + 3) = 16 m, both sides32 m of bead
ScrewsTwo lengths; count from the board layout at the specified centresPer maker’s rate
Tape and compoundFace-layer joints, both sidesPer maker’s consumption rate
Our own example. Add studs at door jambs and openings, noggings for fixtures, and deflection-head profiles if the structure needs them.

Site practice that keeps partitions straight and quiet

  • Set out on the floor with a chalk line and plumb up to the soffit before fixing tracks.
  • Fix studs into the tracks so they can be adjusted, and keep the open side of all studs facing the same way so boards are fixed in sequence.
  • Plan services before boarding: cable routes, back boxes and pipe positions, with sealing details for any fire-rated wall.
  • Add noggings or plates now for kitchen cabinets, wall-hung WCs, basins, TVs and handrails; they cannot be added easily later.
  • Stagger joints between layers and between the two sides.
  • Seal the perimeter before the skirting goes on; most sound leaks are at the edges.
  • Use the screw length and spacing in the specification; over-driven screws that break the paper do not hold.

Finishing and painting

Once joints are taped, filled and sanded, either skim the whole wall or apply a drywall primer before painting, as the specification above allows. Sealing the board evenly stops the paper and the joint compound from absorbing paint at different rates. For product choices, see our interior wall paint system guide.

Questions we are often asked

Can a gypsum partition hold a TV or kitchen cabinets?

Yes, if you plan for it: add timber or steel noggings between studs at the right height before boarding, and use fixings designed for the load.

Is one layer of board each side enough?

For a simple room divider with no fire or sound requirement, often yes. For better sound, impact strength or a fire rating, two layers each side is common.

How thick is a gypsum partition?

Stud depth plus the boards. A 48 mm stud with two 12.5 mm layers each side is about 100 mm; Knauf’s KW 112 ranges from about 100 mm to over 215 mm depending on build-up.

Send us your partition specification or drawing and we will price the boards, profiles, screws, insulation, sealant and joint materials as one package. Message us on WhatsApp. Al Tashteb Al Saree Building Materials Trading, Bu-Tina, Sharjah.

Sources

Retrieved November 2026. The take-off is our own example. Always build to the regional manufacturer’s specification for the performance your project needs.

Leave a Comment

Your email address will not be published. Required fields are marked *

Shopping Cart
Scroll to Top